Project relocation: every site and phase in one relocation plan

A project relocation is a move made up of several parts: several sites or departments, often in phases and dependent on a contractor or IT partner. One project leader from Oomen Movers & Storage brings everything together in one relocation plan, coordinates with the other parties and stays your contact until handover.

One project leader: whoever does the survey also oversees the work
Our own storage as a buffer: containers in Katwijk and Tilburg, back on call-off
Certified for project relocations: ISO 9001, ISO 14001 and VCA, audited by Kiwa
Go to the request

Request a project relocation quote

  • Completely free of obligation
  • Arranged within 1 working day

Request a project relocation quote

Salutation *
  • Completely free of obligation
  • Arranged within 1 working day
The largest in the NetherlandsInsured up to € 125,000 with no deductibleA response within an hour on working days4.8 out of 5 stars on Google, 1,122 reviews
Trusted by
Tilburg UniversityBoschGGDRETCZ
What it is

What is a project relocation?

A project relocation consists of several moves that follow on from each other. The first step determines when the next department or site is up, which is why the work starts with the order.

One move

Business relocation

Your organisation moves from one building to another, in one day or spread over a few days.

One departure address and one new building
An order per department
One date to work towards
More about business relocation
Several moves

Project relocation

Several moves run side by side, or the move depends on work done by others.

Merging, splitting or moving sites
In phases, while the building stays in use
Out temporarily for a renovation, then back
A schedule tied to the contractor or IT
Not sure?

Describe your situation in the request. The project leader will tell you what suits it best.

Approach

Three kinds of project, three orders of work

Every project starts with a survey and a relocation plan. After that, the order depends on the kind of project.

1

Survey per site

The project leader walks through every site and records the volume, the lifts and the loading and unloading areas per department.

2

Order in the relocation plan

It sets out which site moves when and which departments need to be up and running first.

3

Move codes per destination

Every desk, cabinet and box gets a code that matches a spot on the new floor plan. That way nothing ends up at the wrong site.

4

Work per site

Teams work under a foreman, and the project leader keeps the overview. If you wish, we hand over the old sites broom-clean.

1

Setting the phases

Together we decide which departments or floors belong together and who needs to be working again first.

2

Making room

If a floor has to be cleared first, the inventory goes in containers to our climate-controlled storage for the time being.

3

Working around daily use

If a department cannot close for a day, we can move in the evening or at the weekend by arrangement. With one of our own moving lifts, up to the 13th floor, the lifts in the building stay available.

4

Finishing each phase

Desks are set out according to the floor plan before the next phase starts. We close the project with a short evaluation.

1

Planning with the contractor

The project leader agrees with you and the contractor what has to be empty and when.

2

Packing and storing

Everything gets a code for the room it came from and goes in containers to our climate-controlled storage. Anything you need in the meantime, we bring back on call-off.

3

Moving with the schedule

If the work overruns, we move with it wherever we can. The inventory then stays in storage until the space is ready.

4

Moving back in

When the building is ready, we bring everything back and set it out according to the floor plan. We reassemble furniture straight away.

Who does what

Who does what during a project relocation

In a project, several parties work in the same building at the same time. That is why the relocation plan sets out in advance who is responsible for what.

Oomen

Project leader

Does the survey, writes the relocation plan and is your dedicated contact. There is no handover halfway through.

Oomen

Foreman

Leads the team on site and works through the order in the relocation plan. If something has to change on the floor, the foreman is the person to speak to.

Your organisation

Contact per site

Makes decisions about the order and arranges keys and access.

Your organisation

IT department or IT partner

Disconnects and reconnects equipment and tests it after the move. We pack the equipment and transport it.

Other parties

Contractor

Determines when rooms have to be empty during a refurbishment or renovation. We fix the dates per phase, so everyone knows when work can start.

Other parties

Building manager

If you share a building with other tenants, we agree the times for goods lifts and loading areas in advance.

Storage

Our own storage as a buffer between phases

In a project, not everything fits in the right place at the right time. Whatever has nowhere to go for now moves in a container to our climate-controlled storage in Katwijk or Tilburg and comes back as soon as the next phase starts. Storage is in the same quote as the move.

More about business storage
Stacked containers in an Oomen storage hall

Back on call-off

We bring archives, furniture and equipment back as soon as you need them.

Scale up or down per container

You pay per month, with a minimum of one month.

Room for large volumes

Our storage halls hold more than 1,000 containers, so large volumes can go into storage for a while too.

Sectors

Project relocation by sector

The difficulty lies somewhere else in every sector. Below you can see who we work for and how we approach each sector.

Tenders

What buyers ask for in a project relocation

In a tender or framework agreement, what counts is what you can demonstrate.

More about our certifications →
Project relocations in the scope

Project relocations are in the scope of our certificates, and Kiwa audits us on them every year.

Confidential information

Archives go in order into numbered archive boxes, sealed on request. Our information security is certified to ISO 27001.

People with a VOG and VCA

Every mover is trained and holds a certificate of conduct (VOG) and a VCA diploma.

CO₂ report on request

We drive 27 electric vehicles. On request we carry out a relocation CO₂-neutrally, with a report included.

Certification
ISO 9001 certificaatISO 9001
ISO 14001 certificaatISO 14001
VCA certificaatVCA
ISO 27001 certificaatISO 27001

Achieved at group level, with the scope of carrying out national and international relocations and project relocations. The audit was carried out by Kiwa.

Tender or framework agreement?

We supply the requested certificates, references and a project plan. Moving, assembly, moving lifts and storage can all come under one contract.

Request a project proposal
Oomen mover with blue moving crates in the hall of an education building
Planning and costs

What a project relocation costs and how far ahead to plan

We plan eight weeks ahead, and there is often still room at short notice. For a project in phases, we fix the dates per phase as soon as the contractor's schedule is known.

What it costs depends on the number of sites and phases, the volume, access to lifts and loading areas, how long things stay in storage and whether you move outside office hours. The quote follows the survey. It also states how the price is calculated: on a time-and-materials basis, with an estimate or as a fixed sum.

What you can already tell us when you request a quote

  • The addresses of all sites, even if they are not final yet
  • The number of desks and departments per site
  • The contractor's schedule, if there is one
  • The date by which a building must be empty
  • Whether you need temporary storage
What clients say

Reviews from business customers

What business customers write on Google about our service.

Service area

Project relocation in the Randstad and North Brabant

We work from our branches in Katwijk, Rotterdam and Tilburg, in the Randstad and North Brabant.

Frequently asked questions about a project relocation

Is your question not listed? Call 088 321 99 00 and you will speak to a project leader.