Skip to content

Office relocation with a dedicated project leader

In an office relocation, desks, IT and archives move to the new office. A project leader surveys both buildings and writes a relocation plan in which every desk gets a move code. On moving day the team works under a foreman, so that every desk ends up in the right place in the new office.

One dedicated project leader: from the survey until the handover of the old office
A move code for every desk: so everything lands in the right place on the new floor plan
Outside office hours if needed: in the evening or at the weekend, by arrangement
Go to the request

Request an office relocation quote

  • Completely free of obligation
  • Arranged within 1 working day
The largest in the NetherlandsInsured up to € 125,000 with no deductibleA response within an hour on working days4.8 out of 5 stars on Google, 1,106 reviews
Trusted by
Tilburg UniversityBoschGGDRETCZ
What we take care of

What Oomen takes care of in an office relocation

An office is more than desks. The relocation plan sets out for each part how it is packed, when it moves and where it goes in the new office.

Desks and furniture

Desks, chairs, cabinets and meeting rooms. Furniture that has to be taken apart, we reassemble straight away in the new office.

IT and monitors

Computers, monitors and printers go in separate crates. We agree disconnecting and reconnecting with your own IT department or IT partner.

Archives and files

In numbered archive boxes, sealed if you wish, so that every file ends up in the same place. Our information security is certified to ISO 27001.

Packing per desk

Staff pack their own desk with our crates and labels, or our movers do it. After the move we collect the crates again.

The old office

If you wish, we clear the old office and hand it over broom-clean.

Approach

How an office relocation works

Each step shows what the project leader does and what we need from you.

1

Survey of both offices

The project leader walks through the current and the new office and looks at the number of desks, the lifts, the loading and unloading options and the route.

You arrange: the floor plan of the new office.
2

Relocation plan and move codes

Once you accept the quote, the project leader writes the relocation plan. Every desk, cabinet and box gets a code that matches a spot on the new floor plan.

You arrange: a contact person for each department.
3

Packing

Staff pack their desk with our crates and labels, or our movers do it. We pack IT equipment and archives separately.

You arrange: a moment by which everyone has packed their desk.
4

Moving day

A team led by a foreman moves the office in the order of the relocation plan. If the office cannot close for a day, we move in the evening or at the weekend.

You arrange: a key holder at both addresses.
5

First working day

Desks are set out according to the floor plan and the furniture has been reassembled. We collect the crates afterwards.

You arrange: a handover moment with your facilities contact.
Oomen movers during an office relocation
Planning

Planning and costs of your office relocation

We plan eight weeks ahead, and there is often still room at short notice. What an office relocation costs depends on the number of desks, the volume, the distance between the two offices, access to lifts and loading areas, and whether you move outside office hours. The quote follows the on-site survey.

What you can already tell us when you request a quote

  • Both addresses, even if the new office is not final yet
  • The number of desks and departments
  • The preferred period, or the date by which the old office must be empty
  • Special items such as archives or server equipment
Reserve a period
Continuity

Keep working during the office relocation

We agree these points in advance in the relocation plan.

More about our certifications →
Order per department

Departments that need to be up and running first, such as customer service or IT, get the first slot.

In phases if needed

If the office cannot close for a day, we move in phases, in the evening or at the weekend. Otherwise we simply move during the day.

Lifts and loading times

If you share the building with other tenants, we agree the times for goods lifts and loading areas with the building manager in advance.

Electric into the city

In most cases we move with an electric vehicle. We can enter zero-emission zones without an exemption.

Certification
ISO 9001 certificaatISO 9001
ISO 14001 certificaatISO 14001
VCA certificaatVCA
ISO 27001 certificaatISO 27001
Service area

Office relocation in the Randstad and North Brabant

We work from our branches in Katwijk, Rotterdam and Tilburg, in the Randstad and North Brabant.

Frequently asked questions about an office relocation

Is your question not listed? Call 088 321 99 00 and you will speak to a project leader.

Request an office relocation

Yes. If your office cannot close for a day, we move in phases, in the evening or at the weekend. If there is no need, we simply move during the day. The relocation plan sets out when each department moves.