Business moving without downtime
Relocating an organisation is project work. A project manager takes stock department by department, sets out the phasing in a plan of action and coordinates with the building manager, the owners' association and IT. On moving day a fixed team works under an experienced foreman, outside office hours or at the weekend if you prefer, so your operations keep running. From office, warehouse and production to care, education and government, and from IT and archives to art transport: we move it, in most cases electrically.

From a single department to an entire building
You take the whole move or just the part you cannot organise yourself. Everything is in one quote, with one project manager as your point of contact.
Business relocation
The complete relocation of your organisation, with a project manager who writes the plan of action and sets out the phasing per department.
More about this service →Office relocation
Workstations, furniture and IT, with moving codes per desk and a floor plan of the new level.
More about this service →Project relocation
Several locations or phases, with one project manager as your point of contact and a continuity plan per phase.
More about this service →Business storage
Stock, archives or surplus furniture in our climate-controlled storage. Scale up and down per container.
More about this service →Business moving lift
Eighteen moving lifts of our own, up to the thirteenth floor and up to 400 kg. Also available separately for construction and project logistics.
More about this service →Handyman and assembly service
Assembling and dismantling furniture, mounting and connecting equipment, and getting the old location ready for handover.
More about this service →Every sector has its own conditions
A care location cannot close, a school moves during the holidays and with government it starts with a tender. Every day we relocate organisations in care, education, government and business.
Care
Residents' rooms, aids and medical equipment, with care continuing throughout the move.
View this sector →Education
Classrooms, teaching materials and IT, carried out during holidays or outside lesson times so the timetable stays put.
View this sector →Government
Tenders, confidential files and working outside opening hours. On request we report the CO₂ savings.
View this sector →Housing associations
Turnover homes, resident support and temporary storage, as a project or on call.
View this sector →From intake to handover in four phases
With a business relocation the work is in the preparation. Below is what happens in each phase and what we need from your side.
Intake and taking stock
A project manager walks through your building, takes stock department by department and determines the critical path, the lift capacity and the loading and unloading times.
Plan of action and phasing
You receive a plan of action with the phasing, moving codes per workstation and the arrangements with the building manager, the owners' association and IT. It also sets out who does what.
Execution
We move during the day, or in phases, in the evening or at the weekend if you prefer. Archives and equipment are packed separately and loaded last, so the order stays intact.
Handover and aftercare
Furniture assembled, workstations laid out to the floor plan, packing materials collected and reused. We close with a short evaluation.
What we set out before anything moves
Downtime and missing items almost always come from things nobody had written down. That is why this is in every plan of action, before the first box is packed.
Every workstation, cabinet and box gets a code that matches a spot on the new floor plan. That way nothing ends up on the wrong floor.
We book shared goods lifts and loading docks in advance with the building manager, including a fallback slot.
Archives go in and out of the cabinet in order and can be transported sealed. Our information security is ISO 27001 certified.
The same person who did the intake is on the floor on moving day. No handover halfway through the project.
ISO 9001
ISO 14001
VCA
ISO 27001Achieved at group level, with the scope covering national and international relocations and project relocations. The audit was carried out by Kiwa.
A tender or a framework contract?
We supply the requested certificates, references and a project plan, and think along about phasing and SLAs. On request we report the CO₂ savings of the move.
Request a project proposalIs your type of relocation among these?
These are the relocations clients approach us for most often. Whether it fits entirely within our scope or we bring in a specialist, we determine at the intake. We say so up front, not halfway through.
Reviews from business customers
Offices, care institutions, schools and government bodies, relocated from our branches in Katwijk, Rotterdam and Tilburg.
Our location could not close, so the move was done department by department while care continued. Calm people, careful with residents' rooms and aids.
Two school buildings relocated during the summer holidays. The planning was met, classrooms were laid out and the surplus furniture was taken away for reuse.
Frequently asked questions about business moving
Ask your question in the requestYes. We move in phases and, if you prefer, outside office hours or at the weekend. In the plan of action we set out per department what moves when, so your operations keep running.
Have a project manager take a look
Briefly describe your location, the number of workstations and the period you have in mind. On business days you get a response within an hour and we schedule a survey on site.